








Take a Note 2024 MEDIUM WEEKS PLANNER B6
Quantity:
Please note! This is a pre-order item. Shipping approximately on week 40.
Take a Note 2024 MEDIUM WEEKS PLANNER B6
Dated 2024 planner in size B6 with Tomoe River paper. The versatile planner features pale-colored grid lines, so the users won’t find the layout too complicated. Another most-praised feature is that the planner provides a flexible environment, so users can write meticulously to fully use it, or they can easily customize the planner.
KEY FEATURES:
224 Pages|68gsm Tomoe River Paper|180-degree Flat Laying|B6 size (12.8 × 18.2 × 1.2cm) | From January to December 2024
- Brand new design concept for 2024! Simpler, lighter, and more flexible.
- Inner pages are made of 68gsm white Japanese Tomoe River paper with exposed spine binding, allowing for a complete 180-degree flat layout.
- Weekly planning section with two pages per week. Utilizes varying shades of color and line thickness to divide daily time, replacing the traditional hourly timeline format.
- The bottom of each page is covered in extremely faint grid patterns, breaking free from rigid frameworks and providing more writing space.
- Compatible with RECORD series stickers.
Packed with loveFast international shippingSecure Payments